>I'm figuring two months at 40 hrs per week. Sound about right? My builder's log shows 332 hrs on the gear. Could be that some of the electric stuff got logged under "electric system" so consider that a lower limit. Best Simon Simon Aegerter, Winterthur, Switzerland