[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
REFLECTOR: build time RG
Just out
of curiosity. I just finished in roughly 90 hrs, all bulkheads and installation
of them, nose gear doors, and wire ducts.. Am beginning hard point installations
in keel and for hydraulic actuators under keel (3) for RG.. About how long did
it take most of you guys to get from this stage to gear done and cycling
perfectly in hours of work? I'm just curious. I'm figuring two months at 40 hrs
per week. Sound about right? My plan is to be done with gear before may and
putting the top on this summer. If that is reasonably possible. Just sent off
for the prewire hydraulic kit too.
B. David
Cowan
RG
Elite..