REFLECTOR: Welcome back

Chuck Jensen cjensen at dts9000.com
Tue Sep 21 12:19:26 CDT 2004


I was down at the Factory this weekend and can confirm the area went through
some 'instant urban renewal'.  The tent-hangar beside the main hangar was
volume reduced but the main hangar seems to have done fine.  I think the
biggest hassle at this point is the phone system is still out.  

They are definitely back in the Swing of things (pun intended) and I hope
the next week will put a 'period' on my 8 months odyssey through the
wilderness of panel changes and minor changes (Note: the 8 months were NOT
at Velocity, but at another party that will remain nameless--had I been
smarter, it would have been 3-4 months at the Factory instead of 8 months
for a partially completed job elsewhere).  Long sad story but it's finally
looking like a happy ending thanks to the Velo Factory.

Chuck


More information about the Reflector mailing list