REFLECTOR:Filling a gap

Tony Babb reflector@tvbf.org
Mon, 12 May 2003 01:42:05 -0700


I'm installing the top NACA molded scoops in my SEFG. I cut one of the holes
in the firewall a little too enthusiastically and now have about a quarter
inch gap between the floor of the scoop and the hole in the firewall - the
sides are a good fit.

Is it sufficient to fill with flox before covering with BID or do I need
some additional padding in the gap? If so any suggestions on what I should
use?

Thanks all

Tony

SEFG