[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

fuel vent line



We are in the process of putting in the vent lines in our fixed gear
elite.  The KPC 060 states to run the line forward of the main gear
bulkhead because of the  composition of the flooring in that area.  My
question is:  Do we also do away with the naca scoop preparation as well
as the slanting of the hole that is drilled to accept the vent line? 
The sketch looks like the hole is drilled straight down then slant the
cut off end of the line with a 1/8' hole drilled in the protrusion.  Is
that all that is needed?  And--secure in with micro in the fuselage
floor?
Thanks,  juanita Londenberg